FAST Program for Specialty Ceilings

SPECIALTY CEILINGS IN LESS THAN 4 WEEKS

All-new FAST1, FAST3, FAST4 program focused on quick lead times.

Meet FAST1, FAST3, and FAST4 for Specialty Ceilings.

Now, standard products available in 4 weeks or less provide a variety of options and offer short lead times to fit most budgets. Standard sizes and colors mean no shop drawings or submittal sample approvals. Package with the diverse portfolio of Armstrong solutions.

Lead Time Matters!
Click on the FAST icon below to see product options for your desired lead time.

* View complete FAST program details in the disclaimer section below.

FAST PROGRAM PRODUCT OPTIONS

What products can I get in one (1), three (3), or four (4) weeks order-to-ship?

Follow the below steps and see the value our all-new FAST Program can bring to your project!

FAST134 Product Options

Step 1: Select the “Material” type for your project
Step 2: Select your desired “Lead Time” you need the product by
Step 3: Click on the product line to see complete “Configure an Item” options

Disclaimer: What Matters?

Stock vs. Made-to-Order Matters
FAST3 & FAST4 items are made-to-order and will ship direct. FAST1 (stocked items) will go through distribution and depend on distributor truck schedules. In those rare instances when we are out of stock or a lead time is unacceptable, find a close alternative using the Lead Time filters. All lead time information is updated on a weekly basis.
Size of Job Matters
Big jobs, over 2500 SF or 50 pieces for shapes/vertical elements may have longer lead times.
Location Matters
Transit time not included. We are ready to ship FAST1 products, but for Western U.S. shipments (Wyoming and West), assume +1 week.
Distributor Truck Schedule Matters
We rely on distribution to help move products around the country. When speed matters, work with local distributor to ensure FAST service.