Traditional vs. Pre-Engineered
-
90° Soffits
90° Soffits
Traditional
Framed studs 16” on-center to deck and inconsistent visuals
Pre-Engineered
Replaces studs with hanger wires – 2-3x the output
-
Step Soffits
Step Soffits
Traditional
Framed studs 16” on-center to deck and inconsistent visuals
Pre-Engineered
Replaces studs with hanger wires – 2-3x the output
-
Drywall Pockets
Drywall Pockets
Traditional
Framed studs 16” on-center to deck and inconsistent visuals
Pre-Engineered
Replaces studs with hanger wires – 2-3x the output
-
U-Box/Bulkheads
U-Box/Bulkheads
Traditional
Framed studs 16” on-center to deck and inconsistent visuals
Pre-Engineered
Replaces studs with hanger wires – 2-3x the output
Videos
Why Specify Drywall Grid Soffits
Specify drywall grid for soffits and light coves to positively impact challenges faced with MEP conflicts, RFI’s, VE’s, skilled labor, construction schedules, and green building. Learn how drywall grid can modularize builds with half the labor.
90 Degree Soffit Installation
See how John builds a 90 degree soffit out of Armstrong Drywall Grid System.
Drywall Grid Soffit Case Study
Have you wanted to learn more about, or even start converting your drywall soffit projects to drywall grid framing? This interview will give you great insight into what this contractor learned after diving head-on into drywall grid soffit framing.
Support
We are here to help at all phases of the construction process.
Start improving construction efficiencies on the job-site.
Bring your one-of-a-kind ideas to life.
Questions? Our product experts are here to help!
View our extensive partners across lighting, MEP, and shades.
Resources
Drawing Details
-
CAD Drawings
- HTML
-
BIM/REVIT Files
- HTML
Brochures
-
Details Make the Difference
- 3M